DocumentCode
1846772
Title
Verifying the Produce of Car-Bind through Timed Petri Net
Author
Lee, Dong-liang ; Tu, Jih-Fu ; Lee, Hsuan-Jung ; Chen, Kwang Pi
Author_Institution
Dept. of Inf. Manage., St. John´´s Univ., Taipei, Taiwan
fYear
2012
fDate
26-29 March 2012
Firstpage
1332
Lastpage
1336
Abstract
The automobile industry was faced a decreasing marketing with the impact of economic crises gradually. The manufacturer need to progress for the material cost control and reduced its man hour or man power on the manufacturing process. This would make an achievement of a higher production capacity and more profit area obviously. This study was approved by the research data that the Petri Net architecture could be verified for the process of product currently. And it could identify the conflict and the consuming of man power in which of obstructing working station. Finally, we built up a simulating model by the Petri.NET Simulator 2.0 to solve the expend problem of man power eventually.
Keywords
Petri nets; automobile industry; production engineering computing; Petri.NET Simulator 2.0; automobile industry; car bind; economic crisis; marketing; timed Petri net; Assembly; Automobiles; Conferences; Dispatching; Educational institutions; Wires; Cost control; Petri Net; Process control; Production capacity;
fLanguage
English
Publisher
ieee
Conference_Titel
Advanced Information Networking and Applications Workshops (WAINA), 2012 26th International Conference on
Conference_Location
Fukuoka
Print_ISBN
978-1-4673-0867-0
Type
conf
DOI
10.1109/WAINA.2012.51
Filename
6185349
Link To Document