Total re-vamp of Cimento Tupi`s clinker production line at the Pedra do Sino plant
Author
Pospisil, Jaroslav ; Cerny, Jaroslav
Author_Institution
PSP Eng. A.S., Prerov, Czech Republic
fYear
1998
fDate
17-21 May 1998
Firstpage
233
Lastpage
245
Abstract
The paper describes the original 1600 t/day plant as built in 1976, its modification in 1981, and the complete re-vamping and modernization project in 1992-1993, including five years of operating results and experience since then. It reports why the original preheater was replaced, the second branch modified, the precalciner added, the kiln shell replaced and the cooler re-designed. It further explains how this entire project was arranged for the kiln shut-down time of only 85 days
Keywords
cement industry; grinding; maintenance engineering; motor drives; project engineering; 85 d; Brazil; cement plants; cooler re-design; kiln shell replace; modernization; modification; operating experience; operating results; precalciner; preheater replacement; projects; Buildings; Calcination; Cement industry; Cities and towns; Cyclones; Heating; Investments; Kilns; Production; Surface reconstruction;
fLanguage
English
Publisher
ieee
Conference_Titel
Cement Industry Technical Conference, 1998. 40th Conference Record. 1998 IEEE/PCA
Conference_Location
Rapid City, SD
ISSN
1079-9931
Print_ISBN
0-7803-3941-X
Type
conf
DOI
10.1109/CITCON.1998.679250
Filename
679250
Link To Document