DocumentCode :
1848387
Title :
Optimization of the production planning for remanufacturing
Author :
Zhao, Zhong
Author_Institution :
Sch. of Econ. & Manage., China Univ. of Pet. (East China), Qingdao, China
Volume :
2
fYear :
2011
fDate :
13-15 May 2011
Firstpage :
372
Lastpage :
375
Abstract :
Remanufacturing is a new kind of manufacturing mode which could save resource and protect the environment. In this paper, we first analyse the characteristics of remanufacturing process. Then we construct a chance constrained programming model for production planning of remanufacturing. To solve the problem, the deterministic approximation method is used. Then we compare the error range of the deterministic problem and the original problem. The numerical example shows that the relative error is in the acceptable range and the deterministic approximation method is effective.
Keywords :
optimisation; production planning; recycling; chance constrained programming model; deterministic approximation method; environment protection; production planning; remanufacturing process; Approximation methods; Manufacturing; Planning; Production planning; Programming; Uncertainty; Chance constrained programming; Deterministic approximation method; Relative error range; Remanufacturing production planning;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Business Management and Electronic Information (BMEI), 2011 International Conference on
Conference_Location :
Guangzhou
Print_ISBN :
978-1-61284-108-3
Type :
conf
DOI :
10.1109/ICBMEI.2011.5917925
Filename :
5917925
Link To Document :
بازگشت