• DocumentCode
    1849147
  • Title

    Can the operating conditions of the cable system effect the data of the field PD testing?

  • Author

    Ahmed, Nezar ; Srinivas, Nagu

  • Author_Institution
    DTE Energy Technologies, Inc., Farmington Hill, MI, USA
  • fYear
    2001
  • fDate
    2001
  • Firstpage
    311
  • Lastpage
    314
  • Abstract
    Two approaches are available to detect PD from cables, on-line and off-line detection system. During off-line testing, the cable system is normally tested under no-load conditions while the system loading during on-line testing varies depend on the time of testing. For some insulation defects, PD intensity is load dependent. In some other, PD occurs only at certain load conditions. The types of defect that is affected by the cable loading are presented in this paper. Laboratory and field PD data of testing cables at different loading conditions are also presented
  • Keywords
    insulation testing; partial discharges; power cable insulation; power cable testing; cable system; field PD testing; insulation defects; no-load conditions; off-line detection system; off-line testing; on-line detection system; operating conditions; partial discharge; Cable shielding; Communication cables; Insulation; Loading; Mechanical cables; Partial discharges; Petroleum; Power cables; System testing; Viscosity;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Electrical Insulation and Dielectric Phenomena, 2001 Annual Report. Conference on
  • Conference_Location
    Kitchener, Ont.
  • Print_ISBN
    0-7803-7053-8
  • Type

    conf

  • DOI
    10.1109/CEIDP.2001.963546
  • Filename
    963546