• DocumentCode
    1851638
  • Title

    Schedulability and Scheduling of Dual-Arm Cluster Tools with Residency Time Constraints Based on Petri Net

  • Author

    Wu, NaiQi ; Zhou, MengChu

  • Author_Institution
    Dept. of Ind. Eng., Guangdong Univ. of Technol., Guangzhou
  • fYear
    2006
  • fDate
    8-10 Oct. 2006
  • Firstpage
    87
  • Lastpage
    92
  • Abstract
    Because of residency time constraints for cluster tools, it is very difficult to schedule them. This paper addresses their scheduling issues and conducts their schedulability analysis. A Petri net (PN) model, called resource-oriented PN (ROPN) is developed to model them. Based on it, for the first time, necessary and sufficient conditions under which the system is schedulable are presented. Meanwhile, an algorithm is developed for the scheduling of dual-armed cluster tool. The algorithm finds an optimal periodic schedule analytically if it is schedulable. A method is also presented for the implementation of the obtained cyclic schedule by appropriately controlling the initial transient process. Examples are presented to show the application and power of the theory and algorithm
  • Keywords
    Petri nets; industrial robots; scheduling; semiconductor device manufacture; Petri nets; cyclic schedule; dual-arm cluster tools; optimal periodic schedule; residency time constraints; resource-oriented PN; schedulability; scheduling; semiconductor manufacturing; Automation; Clustering algorithms; Job shop scheduling; Linear programming; Robot kinematics; Scheduling algorithm; Semiconductor device modeling; Service robots; Sufficient conditions; Time factors;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Automation Science and Engineering, 2006. CASE '06. IEEE International Conference on
  • Conference_Location
    Shanghai
  • Print_ISBN
    1-4244-0310-3
  • Electronic_ISBN
    1-4244-0311-1
  • Type

    conf

  • DOI
    10.1109/COASE.2006.326860
  • Filename
    4120326