DocumentCode :
1851638
Title :
Schedulability and Scheduling of Dual-Arm Cluster Tools with Residency Time Constraints Based on Petri Net
Author :
Wu, NaiQi ; Zhou, MengChu
Author_Institution :
Dept. of Ind. Eng., Guangdong Univ. of Technol., Guangzhou
fYear :
2006
fDate :
8-10 Oct. 2006
Firstpage :
87
Lastpage :
92
Abstract :
Because of residency time constraints for cluster tools, it is very difficult to schedule them. This paper addresses their scheduling issues and conducts their schedulability analysis. A Petri net (PN) model, called resource-oriented PN (ROPN) is developed to model them. Based on it, for the first time, necessary and sufficient conditions under which the system is schedulable are presented. Meanwhile, an algorithm is developed for the scheduling of dual-armed cluster tool. The algorithm finds an optimal periodic schedule analytically if it is schedulable. A method is also presented for the implementation of the obtained cyclic schedule by appropriately controlling the initial transient process. Examples are presented to show the application and power of the theory and algorithm
Keywords :
Petri nets; industrial robots; scheduling; semiconductor device manufacture; Petri nets; cyclic schedule; dual-arm cluster tools; optimal periodic schedule; residency time constraints; resource-oriented PN; schedulability; scheduling; semiconductor manufacturing; Automation; Clustering algorithms; Job shop scheduling; Linear programming; Robot kinematics; Scheduling algorithm; Semiconductor device modeling; Service robots; Sufficient conditions; Time factors;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Automation Science and Engineering, 2006. CASE '06. IEEE International Conference on
Conference_Location :
Shanghai
Print_ISBN :
1-4244-0310-3
Electronic_ISBN :
1-4244-0311-1
Type :
conf
DOI :
10.1109/COASE.2006.326860
Filename :
4120326
Link To Document :
بازگشت