DocumentCode
1851638
Title
Schedulability and Scheduling of Dual-Arm Cluster Tools with Residency Time Constraints Based on Petri Net
Author
Wu, NaiQi ; Zhou, MengChu
Author_Institution
Dept. of Ind. Eng., Guangdong Univ. of Technol., Guangzhou
fYear
2006
fDate
8-10 Oct. 2006
Firstpage
87
Lastpage
92
Abstract
Because of residency time constraints for cluster tools, it is very difficult to schedule them. This paper addresses their scheduling issues and conducts their schedulability analysis. A Petri net (PN) model, called resource-oriented PN (ROPN) is developed to model them. Based on it, for the first time, necessary and sufficient conditions under which the system is schedulable are presented. Meanwhile, an algorithm is developed for the scheduling of dual-armed cluster tool. The algorithm finds an optimal periodic schedule analytically if it is schedulable. A method is also presented for the implementation of the obtained cyclic schedule by appropriately controlling the initial transient process. Examples are presented to show the application and power of the theory and algorithm
Keywords
Petri nets; industrial robots; scheduling; semiconductor device manufacture; Petri nets; cyclic schedule; dual-arm cluster tools; optimal periodic schedule; residency time constraints; resource-oriented PN; schedulability; scheduling; semiconductor manufacturing; Automation; Clustering algorithms; Job shop scheduling; Linear programming; Robot kinematics; Scheduling algorithm; Semiconductor device modeling; Service robots; Sufficient conditions; Time factors;
fLanguage
English
Publisher
ieee
Conference_Titel
Automation Science and Engineering, 2006. CASE '06. IEEE International Conference on
Conference_Location
Shanghai
Print_ISBN
1-4244-0310-3
Electronic_ISBN
1-4244-0311-1
Type
conf
DOI
10.1109/COASE.2006.326860
Filename
4120326
Link To Document