DocumentCode :
1852828
Title :
Two-Instant Reallocation in Two-Echelon Spare Parts Inventory Systems
Author :
Song, Huawei ; LAU, Hoong Chuin
Author_Institution :
Logistics Inst., Nat. Univ. of Singapore
fYear :
2006
fDate :
8-10 Oct. 2006
Firstpage :
342
Lastpage :
345
Abstract :
In this paper, we study the problem of deciding when and how to perform reallocation of existing spare parts in a multi-echelon reparable item inventory system. We present a mathematical model that solves the problem when there are two reallocation instants, in response to the open challenge post by Cao and Silver(2005) to consider two or more possible reallocations within a replenishment cycle
Keywords :
inventory management; maintenance engineering; multiechelon reparable item inventory system; replenishment cycle; spare parts reallocation; two-echelon spare parts inventory systems; Asia; Automation; Availability; Information management; Logistics; Management information systems; Mathematical model; Risk analysis; Silver; Stochastic processes;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Automation Science and Engineering, 2006. CASE '06. IEEE International Conference on
Conference_Location :
Shanghai
Print_ISBN :
1-4244-0310-3
Electronic_ISBN :
1-4244-0311-1
Type :
conf
DOI :
10.1109/COASE.2006.326905
Filename :
4120371
Link To Document :
بازگشت