R&D project process model and AGA based scheduling algorithm
Author
Chen, Yingwu ; Gao, Feng ; Xin, Lining
Author_Institution
Sch. of Inf. Syst. & Manage., National Univ. of Defense Technol., Changsha, China
Volume
4
fYear
2005
fDate
29 July-1 Aug. 2005
Firstpage
2200
Abstract
Because project scheduling is always under the constraint of resources, the method of coupling activities to cope with activity concurrences and activity iterations in project scheduling faces some difficulties. A process model of R&D projects is presented to satisfy requirements of resource constrained project scheduling. The model considers uncertain activity durations, uncertain activity outcomes, activity concurrences, activity iterations, and complex relations between activities. Furthermore, an adaptive genetic algorithm (AGA) is proposed for optimizing the scheduling strategies and the algorithm is illustrated with a case.
Keywords
concurrent engineering; genetic algorithms; project management; research and development management; resource allocation; scheduling; R&D project process model; adaptive genetic algorithm based scheduling; concurrent engineering; resource constrained project scheduling; scheduling strategy; Concurrent engineering; Design optimization; Dynamic scheduling; Information management; Job shop scheduling; Management information systems; Project management; Research and development; Resource management; Scheduling algorithm;
fLanguage
English
Publisher
ieee
Conference_Titel
Mechatronics and Automation, 2005 IEEE International Conference
Print_ISBN
0-7803-9044-X
Type
conf
DOI
10.1109/ICMA.2005.1626906
Filename
1626906
Link To Document