• DocumentCode
    1853356
  • Title

    R&D project process model and AGA based scheduling algorithm

  • Author

    Chen, Yingwu ; Gao, Feng ; Xin, Lining

  • Author_Institution
    Sch. of Inf. Syst. & Manage., National Univ. of Defense Technol., Changsha, China
  • Volume
    4
  • fYear
    2005
  • fDate
    29 July-1 Aug. 2005
  • Firstpage
    2200
  • Abstract
    Because project scheduling is always under the constraint of resources, the method of coupling activities to cope with activity concurrences and activity iterations in project scheduling faces some difficulties. A process model of R&D projects is presented to satisfy requirements of resource constrained project scheduling. The model considers uncertain activity durations, uncertain activity outcomes, activity concurrences, activity iterations, and complex relations between activities. Furthermore, an adaptive genetic algorithm (AGA) is proposed for optimizing the scheduling strategies and the algorithm is illustrated with a case.
  • Keywords
    concurrent engineering; genetic algorithms; project management; research and development management; resource allocation; scheduling; R&D project process model; adaptive genetic algorithm based scheduling; concurrent engineering; resource constrained project scheduling; scheduling strategy; Concurrent engineering; Design optimization; Dynamic scheduling; Information management; Job shop scheduling; Management information systems; Project management; Research and development; Resource management; Scheduling algorithm;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Mechatronics and Automation, 2005 IEEE International Conference
  • Print_ISBN
    0-7803-9044-X
  • Type

    conf

  • DOI
    10.1109/ICMA.2005.1626906
  • Filename
    1626906