• DocumentCode
    1856914
  • Title

    When do you start to design R&M into a product? Concurrent engineering, CALS, and the R&M engineer

  • Author

    Ellinger, Robert S.

  • Author_Institution
    Grumman Data Syst., Bethpage, NY, USA
  • fYear
    1994
  • fDate
    24-27Jan 1994
  • Firstpage
    421
  • Lastpage
    426
  • Abstract
    This paper deals with how reliability and maintainability (R&M) requirements and other requirements of a customer are handled by various approaches to engineering: sequential, concurrent, and requirements-based concurrent. This paper details the Grumman Concurrent Engineering Infrastructure Project´s development of concurrent engineering and requirement-based concurrent engineering together with how R&M fit into the prototypes. It is concluded that requirements-based engineering is the preferred engineering approach
  • Keywords
    concurrent engineering; design engineering; maintenance engineering; reliability; CALS; Grumman Concurrent Engineering Infrastructure Project; computer aided aquisition/logistics support; concurrent engineering; customer requirements; maintainability; reliability; requirements-based engineering; Application software; Concurrent computing; Concurrent engineering; Costs; Data engineering; Design engineering; Maintenance engineering; Manufacturing; Reliability engineering; Thermal stresses;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Reliability and Maintainability Symposium, 1994. Proceedings., Annual
  • Conference_Location
    Anaheim, CA
  • Print_ISBN
    0-7803-1786-6
  • Type

    conf

  • DOI
    10.1109/RAMS.1994.291145
  • Filename
    291145