DocumentCode
1860637
Title
Job Coscheduling on Coupled High-End Computing Systems
Author
Tang, Wei ; Desai, Narayan ; Vishwanath, Venkatram ; Buettner, Daniel ; Lan, Zhiling
Author_Institution
Dept. of Comput. Sci., Illinois Inst. of Technol. Chicago, Chicago, IL, USA
fYear
2011
fDate
13-16 Sept. 2011
Firstpage
317
Lastpage
326
Abstract
Supercomputer centers often deploy large-scale computing systems together with an associated data analysis or visualization system. In this paper, we propose a co scheduling mechanism, providing the ability to coordinate execution between jobs on different systems. The mechanism is built on top of a lightweight protocol for coordination between policy domains without manual intervention. We have evaluated this system using real job traces from Intrepid and Eureka, the production Blue Gene/P and data analysis systems, respectively, deployed at Argonne National Laboratory. Our experimental results quantify the costs of co scheduling and demonstrate that co scheduling can be achieved with limited impact on system performance under varying workloads.
Keywords
data analysis; data visualisation; large-scale systems; parallel machines; processor scheduling; Argonne National Laboratory; Blue Gene/P; Eureka; Intrepid; coupled high-end computing system; data analysis; data visualization; job coscheduling; large scale computing system; lightweight protocol; supercomputer; Analytical models; Computational modeling; Data analysis; Data visualization; Laboratories; Scheduling; System recovery; coscheduling; heterogeneous computing; job scheduling; supercomputer;
fLanguage
English
Publisher
ieee
Conference_Titel
Parallel Processing Workshops (ICPPW), 2011 40th International Conference on
Conference_Location
Taipei City
ISSN
1530-2016
Print_ISBN
978-1-4577-1337-8
Electronic_ISBN
1530-2016
Type
conf
DOI
10.1109/ICPPW.2011.59
Filename
6047306
Link To Document