DocumentCode :
1861558
Title :
Scheduling the dynamic job shop
Author :
Hoitomt, D.J. ; Luh, Peter B.
Author_Institution :
Pratt & Whitney, East Hartford, CT, USA
fYear :
1993
fDate :
2-6 May 1993
Firstpage :
71
Abstract :
The augmented Lagrangian decomposition and coordination technique is applied to a continuous-time formulation of the scheduling problem in a job shop environment. This methodology generates a variety of information that can be used to initialize the algorithm after changes occur, including Lagrange multipliers. In testing the algorithm on actual factory data, the impact of initialization is examined in the context of a fixed computation time. The results indicate that when computation time is limited, the use of initialization from the previous schedule improves the overall schedule quality
Keywords :
scheduling; Lagrange multipliers; Lagrangian coordination; augmented Lagrangian decomposition; dynamic job shop; initialization; scheduling; Continuous production; Dynamic scheduling; Flow production systems; Job shop scheduling; Production planning;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Robotics and Automation, 1993. Proceedings., 1993 IEEE International Conference on
Conference_Location :
Atlanta, GA
Print_ISBN :
0-8186-3450-2
Type :
conf
DOI :
10.1109/ROBOT.1993.291869
Filename :
291869
Link To Document :
بازگشت