• DocumentCode
    1862210
  • Title

    Asset management of the power system in a rail system

  • Author

    Peow, Tan Yong ; Toon, Loi Boon ; Goh, Samuel

  • Author_Institution
    Land Transp. Authority
  • fYear
    2005
  • fDate
    Nov. 29 2005-Dec. 2 2005
  • Firstpage
    1
  • Lastpage
    597
  • Abstract
    The project life cycle of the power system in the railway system starts from the concept study on the power system and its requirements. The study focuses on critical engineering and operational requirements like EMC, earthing and bonding system, stray current, emergency loadings, uninterrupted power requirements etc. The paper presents the project life-cycle of an integrated asset and design management of the power system in a railway system. The lifecycle stages starts from concept study to the decommissioning of the system. Asset management study is carried out on how the equipment maintenance and replacement are tracked by a maintenance management tool. The life-cycle carries on to design, procurement, manufacturing, installation, testing, operation and asset replacement
  • Keywords
    earthing; electromagnetic compatibility; maintenance engineering; rapid transit systems; uninterruptible power supplies; asset management; bonding system; earthing system; emergency loadings; equipment maintenance; maintenance management tool; project life-cycle; rail system power system; stray current; uninterrupted power requirements; Asset management; Bonding; Disaster management; Electromagnetic compatibility; Energy management; Grounding; Power engineering and energy; Power system management; Rail transportation; Railway engineering;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Conference, 2005. IPEC 2005. The 7th International
  • Conference_Location
    Singapore
  • Print_ISBN
    981-05-5702-7
  • Type

    conf

  • DOI
    10.1109/IPEC.2005.206977
  • Filename
    1627266