DocumentCode
1863274
Title
Adjusting MRP with real-time process quality for postponement manufacturing
Author
Miao Wenming ; Chen Yong ; Chen Guanlong
Author_Institution
Maxpower Tool Group Co., Ltd, China
fYear
2012
fDate
3-5 March 2012
Firstpage
371
Lastpage
375
Abstract
Postponement manufacturing often requires that the identical items should be differentiated for customization with different processes at a Customer Process Differentiation Point(CPDP). A significant issue then emerges as how to determine the input item quantity that should be processed with a customization process at a manufacturing stage. A real-time yield rate based methodology is proposed to achieve dynamic adjustment of MRP. The algorithm for implementing the proposed methodology is also developed. A case study shows that the item-differentiating decisions made at CPDP are more reasonable than those made according to traditional MRP approaches.
Keywords
Dynamic adjustment; Material requirement planning; Postponement manufacturing; Real-time yield rate; Uncertain process quality;
fLanguage
English
Publisher
iet
Conference_Titel
Automatic Control and Artificial Intelligence (ACAI 2012), International Conference on
Conference_Location
Xiamen
Electronic_ISBN
978-1-84919-537-9
Type
conf
DOI
10.1049/cp.2012.0994
Filename
6492601
Link To Document