• DocumentCode
    1863274
  • Title

    Adjusting MRP with real-time process quality for postponement manufacturing

  • Author

    Miao Wenming ; Chen Yong ; Chen Guanlong

  • Author_Institution
    Maxpower Tool Group Co., Ltd, China
  • fYear
    2012
  • fDate
    3-5 March 2012
  • Firstpage
    371
  • Lastpage
    375
  • Abstract
    Postponement manufacturing often requires that the identical items should be differentiated for customization with different processes at a Customer Process Differentiation Point(CPDP). A significant issue then emerges as how to determine the input item quantity that should be processed with a customization process at a manufacturing stage. A real-time yield rate based methodology is proposed to achieve dynamic adjustment of MRP. The algorithm for implementing the proposed methodology is also developed. A case study shows that the item-differentiating decisions made at CPDP are more reasonable than those made according to traditional MRP approaches.
  • Keywords
    Dynamic adjustment; Material requirement planning; Postponement manufacturing; Real-time yield rate; Uncertain process quality;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Automatic Control and Artificial Intelligence (ACAI 2012), International Conference on
  • Conference_Location
    Xiamen
  • Electronic_ISBN
    978-1-84919-537-9
  • Type

    conf

  • DOI
    10.1049/cp.2012.0994
  • Filename
    6492601