DocumentCode :
1864216
Title :
The “embedded” consideration for IT project management of E-government system
Author :
Weizhang, Liu
Author_Institution :
Informatic Coll., South China Agric. Univ., Guangzhou, China
Volume :
4
fYear :
2011
fDate :
13-15 May 2011
Firstpage :
546
Lastpage :
550
Abstract :
Aiming at the problem of unbalanced development of construction and operation of E-government system in China, this paper points out that currently there exist five problems such as inconsistency, layout, flow, isolated knowledge and evaluating strategy between construction and operation of E-government system, using the field survey and theory analysis methods. Based on relevant theories, from the angle of view of IT project management, the “embedded” development strategy for construction and operation of E-government system is proposed from five aspects of IT tactic selection, IT concurrent design, IT management mode, IT management process and IT management feedback.
Keywords :
government data processing; project management; IT concurrent design; IT management feedback; IT management mode; IT management process; IT project management; IT tactic selection; e-government system; embedded development strategy; field survey; theory analysis methods; Buildings; Electronic government; Environmental factors; Planning; Project management; IT project management; e-government; embedded development strategy; system construction; system operation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Business Management and Electronic Information (BMEI), 2011 International Conference on
Conference_Location :
Guangzhou
Print_ISBN :
978-1-61284-108-3
Type :
conf
DOI :
10.1109/ICBMEI.2011.5921030
Filename :
5921030
Link To Document :
بازگشت