Title :
DAΦNE status and plans
Author_Institution :
INFN, Lab. Nazionali di Frascati, Italy
Abstract :
The e+e- Φ-factory DAΦNE has been approved and funded in 1990; the detailed engineering design started in 1991 and the construction is proceeding steadily. The beginning of the collider commissioning, with a short term luminosity goal L=1.3 1032 cm-2 sec-1, is scheduled for the end of 1996
Keywords :
colliding beam accelerators; electron accelerators; storage rings; synchrotrons; DAΦNE; collider commissioning; engineering design; positron+electron Φ-factory; short term luminosity goal; Acceleration; Damping; Design engineering; Electrons; Linear particle accelerator; Magnets; Positrons; Radio frequency; Structural beams; Testing;
Conference_Titel :
Particle Accelerator Conference, 1995., Proceedings of the 1995
Conference_Location :
Dallas, TX
Print_ISBN :
0-7803-2934-1
DOI :
10.1109/PAC.1995.504700