• DocumentCode
    1867038
  • Title

    BEPC status and plans

  • Author

    Wang, Shu-Hong

  • Author_Institution
    Inst. of High Energy Phys., Beijing, China
  • Volume
    1
  • fYear
    1995
  • fDate
    1-5 May 1995
  • Firstpage
    506
  • Abstract
    BEPC operation status over the past few years with the results in exciting physics and integrated luminosity enhancement are summarized. The status of the luminosity upgrade project is described. The future plans on the tau-charm factory and the new generation light source are presented
  • Keywords
    colliding beam accelerators; electron accelerators; storage rings; BEPC; Beijing Electron Positron Collider; electron storage ring; integrated luminosity enhancement; light source; luminosity upgrade project; tau-charm factory; Electrons; Energy measurement; Light sources; Physics; Positrons; Production facilities; Radio frequency; Statistics; Strontium; Synchrotron radiation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1995., Proceedings of the 1995
  • Conference_Location
    Dallas, TX
  • Print_ISBN
    0-7803-2934-1
  • Type

    conf

  • DOI
    10.1109/PAC.1995.504702
  • Filename
    504702