• DocumentCode
    1875946
  • Title

    Economic analysis and calculation of the cogeneration upgrade for large fossil fired generation unit

  • Author

    Haisheng Yang ; Shuping Chang ; Ruitao Wu

  • Author_Institution
    Hebei Electr. Power Res. Inst., Shijiazhuang, China
  • fYear
    2012
  • fDate
    8-9 Sept. 2012
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    The theoretical calculation involved in the district heating upgrading of the existing large fossil fired generation units was described. A feasibility study example for an existing 600MW unit was put forward in detail. It is shown that in the feasibility study of heating upgrading scheme, more effort should be made to analyze the part load performance change of the unit except for the full load performance change, in order to get a complete overview of the upgrading effect. It is also shown that for the cogeneration upgrading schemes where the IP and LP turbine crossover piping is the steam source, there exists one balancing operation condition for each operation load condition. When the heating steam supply is lower than the balancing operation condition, the economic negative benefit due to heating supply increases rapidly, and the unit operation under this kind of condition should be avoided if possible.
  • Keywords
    cogeneration; district heating; power generation economics; steam power stations; IP turbine crossover piping; LP turbine crossover piping; cogeneration upgrade; district heating upgrading scheme; economic analysis; economic negative benefit; heating steam supply; large fossil fired generation unit; power 600 MW; steam source; Cogeneration upgrade; Economic analysis; Fossil fired generation unit;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Sustainable Power Generation and Supply (SUPERGEN 2012), International Conference on
  • Conference_Location
    Hangzhou
  • Electronic_ISBN
    978-1-84919-673-4
  • Type

    conf

  • DOI
    10.1049/cp.2012.1809
  • Filename
    6493128