• DocumentCode
    1877723
  • Title

    Short-term hydrothermal scheduling with reservoir volume constraints. II. Parallel simulated annealing approach

  • Author

    Wong, Kit Po ; Wong, Yin Wa

  • Author_Institution
    Dept. of Electr. & Electron. Eng., Western Australia Univ., Nedlands, WA, Australia
  • fYear
    1993
  • fDate
    7-10 Dec 1993
  • Firstpage
    565
  • Abstract
    For pt.I see ibid., vol.2, p.559-64 (1993). This paper develops a coarse-grained parallel simulated annealing algorithm for short-term hydrothermal scheduling. The design of the algorithm takes into consideration load balancing, processor synchronization reduction, communication overhead reduction and memory contention elimination. The algorithm is implemented on an i860 processor in a simulated environment and is applied to a test system. The scheduling results are presented and are compared to those found by a sequential algorithm
  • Keywords
    hydroelectric power stations; hydrothermal power systems; power engineering computing; scheduling; simulated annealing; thermal power stations; communication overhead reduction; i860 processor; load balancing; memory contention elimination; parallel simulated annealing; processor synchronization reduction; reservoir volume constraints; sequential algorithm; short-term hydrothermal scheduling;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Advances in Power System Control, Operation and Management, 1993. APSCOM-93., 2nd International Conference on
  • Conference_Location
    IET
  • Print_ISBN
    0-85296-569-9
  • Type

    conf

  • Filename
    292660