DocumentCode
1877733
Title
Short-term hydrothermal scheduling with reservoir volume constraints. I. Simulated annealing approach
Author
Wong, Kit Po ; Wong, Yin Wa
Author_Institution
Dept. of Electr. & Electron. Eng., Western Australia Univ., Nedlands, WA, Australia
fYear
1993
fDate
7-10 Dec 1993
Firstpage
559
Abstract
This paper develops a short-term hydrothermal scheduling algorithm based on the simulated annealing technique. In the algorithm, the load balance constraint, total water discharge constraint, reservoir volume limits and constraint on the operation limits of the hydrothermal generator and the equivalent thermal generator are fully accounted for. A relaxation method for checking the limits is proposed and included in the algorithm. The performance of the algorithm is demonstrated through an application to a test example. The results are presented and are compared to a conventional method
Keywords
hydroelectric power stations; hydrothermal power systems; scheduling; simulated annealing; thermal power stations; equivalent thermal generator; hydrothermal generator; load balance constraint; relaxation method; reservoir volume constraints; reservoir volume limits; short-term hydrothermal scheduling; simulated annealing; total water discharge constraint;
fLanguage
English
Publisher
iet
Conference_Titel
Advances in Power System Control, Operation and Management, 1993. APSCOM-93., 2nd International Conference on
Conference_Location
IET
Print_ISBN
0-85296-569-9
Type
conf
Filename
292661
Link To Document