Structural imbalances in the Nordic power system — Causes, future expectations and remedies
Author
Haugland, Turi ; Doorman, Gerard ; Hystad, Jan
Author_Institution
Dept. of Electr. Power Eng., Norwegian Univ. of Sci. & Technol., Trondheim, Norway
fYear
2014
fDate
28-30 May 2014
Firstpage
1
Lastpage
5
Abstract
Structural (or deterministic) imbalances are caused by the lack of coherence between on the one hand continuously varying demand and on the other hand scheduled changes of generation at the hour shifts. In the Nordic system this is exacerbated by fast ramping HVDC interconnections and a large share of fast reacting hydro plants. The analysis is focused on the effect of the expected doubling of the HVDC interconnection capacity between the Nordic and continental systems. The paper uses model calculations to estimate the present "raw" imbalances, i.e. the gross imbalances that would occur without control actions. First results for the 2012 system are shown and the effect of reducing the Market Clearing Period to 15 minutes is analyzed. Subsequently the expected 2020 situation is analyzed. With increased ramping, as desired by the market, the results show a significant increase in imbalances. Finally it is shown how a reduction to a 15 minutes Market Clearing Period improves the situation in 2020.
Keywords
HVDC power transmission; hydroelectric power stations; power markets; HVDC interconnection capacity; Nordic power system; continental systems; deterministic imbalances; hydro plants; market clearing period; structural imbalances; time 15 min; Europe; Frequency control; HVDC transmission; Mathematical model; Production; Time-frequency analysis; Power system; imbalance; ramping;
fLanguage
English
Publisher
ieee
Conference_Titel
European Energy Market (EEM), 2014 11th International Conference on the
Conference_Location
Krakow
Type
conf
DOI
10.1109/EEM.2014.6861227
Filename
6861227
Link To Document