DocumentCode
187871
Title
Spanish secondary reserve requirements, clearing and usage
Author
Diaz, Cristian A. ; Gonzalez, P. ; Campos, Fco Alberto ; Villar, Jose
Author_Institution
Inst. for Res. in Technol., Comillas Pontifical Univ., Madrid, Spain
fYear
2014
fDate
28-30 May 2014
Firstpage
1
Lastpage
5
Abstract
The technical and economic importance of electricity ancillary services, responsible for guaranteeing the reliability and security of the power systems, is growing due to the continuous penetration of intermittent technologies. Indeed, changes in the net demand are forcing more expensive thermal generation to provide reserves while reducing their energy production. Therefore generation companies´ are more and more concerned with reserve markets and their impact on the electricity market forecasting models. This paper analyses historical data from the Spanish electricity market to better understand and forecast secondary reserve requirements and real-time secondary reserve usage. It focuses on the relationship between secondary reserve requirements by the System Operator and the secondary reserve finally cleared, the long term evolution of secondary reserve requirements with respect to the intermittent generation growing, their annual and daily seasonalities, the real-time secondary reserve usage and its annual and daily seasonalities, and some additional hints for the requirements forecasting. Several interesting and not always intuitive conclusions are drawn from the analyzed data.
Keywords
electricity supply industry; power markets; power system reliability; power system security; Spanish secondary reserve requirements; electricity ancillary services; electricity market forecasting models; long term evolution; power generation companies; power system reliability; power system security; real-time secondary reserve usage; thermal generation; Economics; Educational institutions; Electricity; Electricity supply industry; Production; Real-time systems; Schedules; secondary reserve estimation; secondary reserve requirements; secondary reserve usage;
fLanguage
English
Publisher
ieee
Conference_Titel
European Energy Market (EEM), 2014 11th International Conference on the
Conference_Location
Krakow
Type
conf
DOI
10.1109/EEM.2014.6861266
Filename
6861266
Link To Document