DocumentCode
1879885
Title
Construction and testing of arc dipoles and quadrupoles for the Relativistic Heavy Ion Collider (RHIC) at BNL
Author
Wanderer, P. ; Muratore, J. ; Anerella, M. ; Ganetis, G. ; Ghosh, A. ; Greene, A. ; Gupta, R. ; Jain, A. ; Kahn, S. ; Kelly, E. ; Morgan, G. ; Prodell, A. ; Rehak, M. ; Sampson, W. ; Thomas, R. ; Thompson, P. ; Willen, E.
Author_Institution
Brookhaven Nat. Lab., Upton, NY, USA
Volume
2
fYear
1995
fDate
1-5 May 1995
Firstpage
1293
Abstract
The production run of superconducting magnets for the Relativistic Heavy Ion Collider (RHIC) project at Brookhaven National Laboratory (BNL) is well underway. Of the 288 arc dipoles needed for the collider, more than 120 have been delivered. More than 150 arc quadrupoles have been delivered. All of these magnets have been accepted for RHIC. This paper reports the construction and performance of these magnets. Novel features of design and test, introduced to enhance technical performance and control costs, are also discussed
Keywords
accelerator magnets; colliding beam accelerators; ion accelerators; storage rings; superconducting magnets; synchrotrons; testing; RHIC; Relativistic Heavy Ion Collider; arc dipoles; arc quadrupoles; construction; design; superconducting magnets; testing; Coils; Contracts; Costs; Insulation; Laboratories; Magnetic field measurement; Magnets; Polyimides; Temperature; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1995., Proceedings of the 1995
Conference_Location
Dallas, TX
Print_ISBN
0-7803-2934-1
Type
conf
DOI
10.1109/PAC.1995.505202
Filename
505202
Link To Document