DocumentCode :
1880101
Title :
Design, construction, and procurement methodology of magnets for the 7-GeV Advanced Photon Source
Author :
Gorski, A. ; Argyrakis, J. ; Biggs, J. ; Black, E. ; Humbert, J. ; Jagger, J. ; Thompson, K.
Author_Institution :
Argonne Nat. Lab., IL, USA
Volume :
2
fYear :
1995
fDate :
1-5 May 1995
Firstpage :
1328
Abstract :
All major magnets of the Advanced Photon Source (APS) have now been measured and installed in the facility. This paper describes the mechanical design, construction, procurement philosophy and methodology, and lessons learned from the construction and procurement of more than 1500 magnets for the APS storage ring, injector synchrotron ring, and positron accumulator ring
Keywords :
accelerator magnets; beam handling equipment; electron accelerators; storage rings; 7-GeV Advanced Photon Source; APS; construction; design; injector synchrotron ring; magnets; positron accumulator ring; procurement; Fabrication; Industrial relations; Laboratories; Magnets; Physics; Positrons; Procurement; Prototypes; Storage rings; Synchrotrons;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1995., Proceedings of the 1995
Conference_Location :
Dallas, TX
Print_ISBN :
0-7803-2934-1
Type :
conf
DOI :
10.1109/PAC.1995.505211
Filename :
505211
Link To Document :
بازگشت