DocumentCode
1880101
Title
Design, construction, and procurement methodology of magnets for the 7-GeV Advanced Photon Source
Author
Gorski, A. ; Argyrakis, J. ; Biggs, J. ; Black, E. ; Humbert, J. ; Jagger, J. ; Thompson, K.
Author_Institution
Argonne Nat. Lab., IL, USA
Volume
2
fYear
1995
fDate
1-5 May 1995
Firstpage
1328
Abstract
All major magnets of the Advanced Photon Source (APS) have now been measured and installed in the facility. This paper describes the mechanical design, construction, procurement philosophy and methodology, and lessons learned from the construction and procurement of more than 1500 magnets for the APS storage ring, injector synchrotron ring, and positron accumulator ring
Keywords
accelerator magnets; beam handling equipment; electron accelerators; storage rings; 7-GeV Advanced Photon Source; APS; construction; design; injector synchrotron ring; magnets; positron accumulator ring; procurement; Fabrication; Industrial relations; Laboratories; Magnets; Physics; Positrons; Procurement; Prototypes; Storage rings; Synchrotrons;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1995., Proceedings of the 1995
Conference_Location
Dallas, TX
Print_ISBN
0-7803-2934-1
Type
conf
DOI
10.1109/PAC.1995.505211
Filename
505211
Link To Document