• DocumentCode
    1880101
  • Title

    Design, construction, and procurement methodology of magnets for the 7-GeV Advanced Photon Source

  • Author

    Gorski, A. ; Argyrakis, J. ; Biggs, J. ; Black, E. ; Humbert, J. ; Jagger, J. ; Thompson, K.

  • Author_Institution
    Argonne Nat. Lab., IL, USA
  • Volume
    2
  • fYear
    1995
  • fDate
    1-5 May 1995
  • Firstpage
    1328
  • Abstract
    All major magnets of the Advanced Photon Source (APS) have now been measured and installed in the facility. This paper describes the mechanical design, construction, procurement philosophy and methodology, and lessons learned from the construction and procurement of more than 1500 magnets for the APS storage ring, injector synchrotron ring, and positron accumulator ring
  • Keywords
    accelerator magnets; beam handling equipment; electron accelerators; storage rings; 7-GeV Advanced Photon Source; APS; construction; design; injector synchrotron ring; magnets; positron accumulator ring; procurement; Fabrication; Industrial relations; Laboratories; Magnets; Physics; Positrons; Procurement; Prototypes; Storage rings; Synchrotrons;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1995., Proceedings of the 1995
  • Conference_Location
    Dallas, TX
  • Print_ISBN
    0-7803-2934-1
  • Type

    conf

  • DOI
    10.1109/PAC.1995.505211
  • Filename
    505211