• DocumentCode
    1880476
  • Title

    Central control systems-dealing with the options

  • Author

    Kemmerer, Jeffrey P.

  • Author_Institution
    Fuller Co., Bethlehem, PA, USA
  • fYear
    1991
  • fDate
    21-23 May 1991
  • Firstpage
    49
  • Lastpage
    64
  • Abstract
    An overview of central control systems is provided for cement plant management personnel who are or will be in a position to upgrade or replace their controls. The author attempts to show that controls and control systems have an increasingly important role in contributing to the successful operation of a plant, and that it is not difficult to understand the common control system configurations. He discusses some of the important factors to be used in weighing the many options available in control systems, and he emphasizes the need for planning the control requirements for both short-term and long-term goals
  • Keywords
    cement industry; control systems; central control systems; management personnel; plant; Automatic control; Automation; Cement industry; Centralized control; Computer architecture; Conference management; Control systems; Costs; Force control; Personnel;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Cement Industry Technical Conference, 1991. XXXIII., Record of Conference Papers. IEEE
  • Conference_Location
    Mexico City
  • ISSN
    1079-9931
  • Print_ISBN
    0-7803-0142-0
  • Type

    conf

  • DOI
    10.1109/CITCON.1991.162796
  • Filename
    162796