DocumentCode
1880476
Title
Central control systems-dealing with the options
Author
Kemmerer, Jeffrey P.
Author_Institution
Fuller Co., Bethlehem, PA, USA
fYear
1991
fDate
21-23 May 1991
Firstpage
49
Lastpage
64
Abstract
An overview of central control systems is provided for cement plant management personnel who are or will be in a position to upgrade or replace their controls. The author attempts to show that controls and control systems have an increasingly important role in contributing to the successful operation of a plant, and that it is not difficult to understand the common control system configurations. He discusses some of the important factors to be used in weighing the many options available in control systems, and he emphasizes the need for planning the control requirements for both short-term and long-term goals
Keywords
cement industry; control systems; central control systems; management personnel; plant; Automatic control; Automation; Cement industry; Centralized control; Computer architecture; Conference management; Control systems; Costs; Force control; Personnel;
fLanguage
English
Publisher
ieee
Conference_Titel
Cement Industry Technical Conference, 1991. XXXIII., Record of Conference Papers. IEEE
Conference_Location
Mexico City
ISSN
1079-9931
Print_ISBN
0-7803-0142-0
Type
conf
DOI
10.1109/CITCON.1991.162796
Filename
162796
Link To Document