DocumentCode
1881670
Title
In-house repair of a 30 Megawatt, S band klystron
Author
Sachtschale, R. ; O´Shea, P.G. ; Ponds, M. ; Swift, G.
Author_Institution
Free Electron Laser Lab., Duke Univ., Durham, NC, USA
Volume
3
fYear
1995
fDate
1-5 May 1995
Firstpage
1536
Abstract
This paper documents the repair and reconditioning of an ITT 2960 klystron that had been at atmospheric pressure for eight months due to a leak in the compression seal for the waveguide window. All work was done in the Duke FEL Vacuum Shop by laboratory staff without any external purchases. The reconditioned klystron is currently being operated at full power on the injection linac for the electron storage ring at Duke
Keywords
accelerator RF systems; electron accelerators; klystrons; linear accelerators; maintenance engineering; 30 MW; Duke electron storage ring; ITT 2960 klystron; S band klystron; injection linac; reconditioning; repair; Cathodes; Electron tubes; Flanges; Klystrons; Laboratories; Leak detection; Linear particle accelerator; Seals; Storage rings; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 1995., Proceedings of the 1995
Conference_Location
Dallas, TX
Print_ISBN
0-7803-2934-1
Type
conf
DOI
10.1109/PAC.1995.505277
Filename
505277
Link To Document