DocumentCode :
1882843
Title :
Reconditioning pulp and paper mill generators for reliable service
Author :
Moore, William G.
Author_Institution :
Nat. Electr. Coil, Columbus, OH
fYear :
2005
fDate :
23-23 June 2005
Firstpage :
239
Lastpage :
248
Abstract :
This paper presents the latest generator "reconditioning" techniques, important to maintaining high reliability for this specialized equipment. These techniques involve preventive and predictive maintenance testing and inspections that, if done consistently, will ensure reliable operation of this class of generators. Also included are three brief case histories that describe activities falling in the category of "major" reconditioning. The focus is on generators rated in the 10 MW to 100 MW range, manufactured in the 1950\´s and 1960\´s. Many of these machines are at or near the end of their life, and they should be reconditioned to provide additional extended service
Keywords :
electric generators; electrical faults; inspection; paper mills; preventive maintenance; reliability; rotors; stators; 10 to 100 MW; electrical testing; ground fault; inspection; paper mill generator; predictive maintenance testing; preventive maintenance; pulp reconditioning; reliability; rotor turn cracking; stator core iron restack; Coils; Corona; Inspection; Paper mills; Partial discharges; Predictive maintenance; Preventive maintenance; Rotors; Stators; Testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Pulp and Paper Industry Technical Conference, 2005. Conference Record of 2005 Annual
Conference_Location :
Jacksonville, FL
Print_ISBN :
0-7803-9089-X
Type :
conf
DOI :
10.1109/PAPCON.2005.1502071
Filename :
1502071
Link To Document :
بازگشت