DocumentCode :
1883638
Title :
PEP-II B-factory prototype higher order mode load design
Author :
Pendleton, R. ; Ko, K. ; Ng, C. ; Neubauer, M. ; Schwarz, H. ; Rimmer, R.
Author_Institution :
Linear Accel. Center, Stanford Univ., CA, USA
Volume :
3
fYear :
1995
fDate :
1-5 May 1995
Firstpage :
1800
Abstract :
To reduce the impedance of the cavity higher order modes, (HOMs), a compact broad-band, low-reflection, waveguide load is required with a VSWR less than 2:1 in the frequency range 714 MHz to 2500 MHz. The load must also work in the high vacuum of the cavity, and be capable of dissipating up to 10 kW of power which is generated by the the interaction of the beam with the cavity HOMs and which is directed to each load assembly. A prototype load assembly is being fabricated which uses the lossy ceramic Al-N with 7% by weight glassy carbon to absorb the microwave power
Keywords :
accelerator cavities; colliding beam accelerators; electron accelerators; storage rings; 10 kW; 714 to 2500 MHz; Al-N; PEP-II B-factory prototype higher order mode load design; compact broad-band low-reflection waveguide load; glassy carbon; lossy ceramic; microwave power; Assembly; Ceramics; Linear accelerators; Loaded waveguides; Optical reflection; Prototypes; Radio frequency; Testing; Tiles; Waveguide components;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1995., Proceedings of the 1995
Conference_Location :
Dallas, TX
Print_ISBN :
0-7803-2934-1
Type :
conf
DOI :
10.1109/PAC.1995.505366
Filename :
505366
Link To Document :
بازگشت