DocumentCode :
1885066
Title :
Training time reduction in producing certified manufacturing technicians for a fabrication environment
Author :
Sheehy, Finbarr
Author_Institution :
Intel, Ireland
fYear :
1997
fDate :
6-8 Oct 1997
Abstract :
Intel´s Fab 10 is challenged to quickly integrate new technologies into high volume manufacturing. This paper outlines how the Training Department in Fab 10 is supporting this challenge by creating new efficiencies and improvements in the delivery of Level 1 Certified Maintenance Technicians (MT) to the production floor. These efficiencies equate to a reduction of up to 30% in the Level 1 Certification time and also provide a positive impact on the quality of the training. This was achieved at no extra cost and was completed on selected functional areas within 3 months of project initiation
Keywords :
certification; integrated circuit manufacture; maintenance engineering; personnel; training; Intel Fab 10 facility; Level 1 Certified maintenance technicians; certified manufacturing technicians; fabrication environment; high volume manufacturing; production environment; training time reduction; Certification; Computer aided instruction; Cost function; Fabrication; Manufacturing; On the job training; Process design; Production; Productivity; Time measurement;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Semiconductor Manufacturing Conference Proceedings, 1997 IEEE International Symposium on
Conference_Location :
San Francisco, CA
Print_ISBN :
0-7803-3752-2
Type :
conf
DOI :
10.1109/ISSM.1997.664483
Filename :
664483
Link To Document :
بازگشت