DocumentCode
1885885
Title
Construction and Control of a Modern Pentathlon Center Installation Engineering
Author
Jin Hu ; Yan Hu
Author_Institution
Sichuan Coll. of Archit. Technol., De-yang, China
fYear
2013
fDate
16-17 Jan. 2013
Firstpage
384
Lastpage
388
Abstract
The Modern Pentathlon Center totally attracts RMB 750,000,000 Yuan investment, covers an area of 360mu and is the modern pentathlon base with largest scale and most perfect facilities in China, which is the first modernized playground gathering the five playing fields of modern pentathlon in the world. The Modern Pentathlon Center Installation Engineering mainly features on large construction area, large work amount, sophisticated construction coordination and technical requirements and high requirement on construction period etc. Meanwhile, the main difficulty of the engineering is large work amount, extensive coordination, many cross operations, sophisticated construction technology and high technical requirement. The paper expounds the key points of engineering construction and control. The engineering is finished successfully on schedule by means of construction control, which could provide some reference experiences for other similar projects.
Keywords
construction; investment; project management; structural engineering; China; Yuan investment; construction control; construction coordination; construction period; modern pentathlon center installation engineering; modernized playground; project management; sophisticated construction technology; technical requirements; Buildings; Cranes; Materials; Pipelines; Safety; Steel; Structural beams; construction; control; installation engineering; pentathlon center;
fLanguage
English
Publisher
ieee
Conference_Titel
Measuring Technology and Mechatronics Automation (ICMTMA), 2013 Fifth International Conference on
Conference_Location
Hong Kong
Print_ISBN
978-1-4673-5652-7
Type
conf
DOI
10.1109/ICMTMA.2013.97
Filename
6493748
Link To Document