  • Abstract
    The NASA Orion Ground Processing Team was originally formed by the Kennedy Space Center (KSC) Constellation (Cx) Project Office´s Orion Division to define, refine and mature pre-launch and post-landing ground operations for the Orion human spacecraft. The multi-disciplined KSC Orion team consisted of KSC civil servant, SAIC, Productivity Apex, Inc. and Boeing-CAPPS engineers, project managers and safety engineers, as well as engineers from Constellation´s Orion Project and Lockheed Martin Orion Prime contractor. The team evaluated the Orion design configurations as the spacecraft concept matured between Systems Design Review (SDR), Systems Requirement Review (SRR) and Preliminary Design Review (PDR). The team functionally decomposed pre-launch and post-landing steps at three levels of detail, or tiers, beginning with functional flow block diagrams (FFBDs). The third tier FFBDs were used to build logic networks and nominal timelines. Orion ground support equipment (GSE) was identified and mapped to each step. This information was subsequently used in developing lower level operations steps in a Ground Operations Planning Document PDR product. Subject matter experts for each spacecraft and GSE subsystem were used to define 5th-95th percentile processing times for each FFBD step, using the Delphi Method. Discrete event simulations used this information and the logic network to provide processing timeline confidence intervals for launch rate assessments. The team also used the capabilities of the KSC Visualization Lab, the FFBDs and knowledge of the spacecraft, GSE and facilities to build visualizations of Orion pre-launch and post-landing processing at KSC. Visualizations were a powerful tool for communicating planned operations within the KSC community (i.e., Ground Systems design team), and externally to the Orion Project, Lockheed Martin spacecraft designers and other Constellation Program stakeholders during the SRR to PDR timeframe. Other - perations planning tools included Kaizen/Lean events, mockups and human factors analysis. The majority of products developed by this team are applicable as KSC prepares 21st Century Ground Systems for the Orion Multi-Purpose Crew Vehicle and Space Launch System.
  • Keywords
    ground support equipment; ground support systems; space vehicles; Kennedy Space Center; NASA Orion ground processing team; NASA planning; Orion design configurations; Orion ground support equipment; Orion human spacecraft; Orion multipurpose crew vehicle ground operations; functional flow block diagrams; ground operations planning document; logic networks; nominal timelines; post-landing ground operations; pre-launch ground operations; preliminary design review; space launch system; systems design review; systems requirement review; NASA; Planning; Space vehicles; System analysis and design; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Aerospace Conference, 2012 IEEE
  • Conference_Location
    Big Sky, MT
  • ISSN
    1095-323X
  • Print_ISBN
    978-1-4577-0556-4
  • Type

    conf

  • DOI
    10.1109/AERO.2012.6187399
  • Filename
    6187399