• DocumentCode
    1889747
  • Title

    Integrated campaign probabilistic cost, schedule, performance, and value for program office support

  • Author

    Cornelius, David ; Sasamoto, Washito ; Daugherty, Kevin ; Deacon, Shaun

  • Author_Institution
    Anal. Mech. Assoc., Anal. Mech. Assoc., Inc., Hampton, VA, USA
  • fYear
    2012
  • fDate
    3-10 March 2012
  • Firstpage
    1
  • Lastpage
    12
  • Abstract
    This paper describes an integrated assessment tool developed at NASA Langley Research Center that incorporates probabilistic analysis of life cycle cost, schedule, launch performance, on-orbit performance, and value across a “campaign”, defined to be a series of planned space-based missions. Originally designed as an aid in planning the execution of missions to accomplish the goals of the National Research Council 2007 Earth Science Decadal Survey, the tool utilizes Monte Carlo simulation of campaigns for assessment of resource requirements and expected return on investment. Interactions between simulated missions, such as competition for launch site manifest, are incorporated to capture unexpected and non-linear system behaviors. A novel value model is utilized to provide an assessment of the probabilistic return on investment. A demonstration case is discussed to illustrate the tool utility.
  • Keywords
    probability; space vehicles; NASA langley research center; integrated campaign probabilistic cost; national research council 2007 Earth science decadal survey; program office support; space-based missions; Data models; Delay; Instruments; Probabilistic logic; Reliability; Schedules; Vehicles;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Aerospace Conference, 2012 IEEE
  • Conference_Location
    Big Sky, MT
  • ISSN
    1095-323X
  • Print_ISBN
    978-1-4577-0556-4
  • Type

    conf

  • DOI
    10.1109/AERO.2012.6187434
  • Filename
    6187434