Title :
The Beam Pumping Unit Synchronization Test Data Analysis and the Application
Author :
Sun Dong ; Li Wei ; Liu Huawei ; Zhou Liang
Author_Institution :
Tech. Inspection Center, Shengli Pet. Adm. Bur., Dongying, China
Abstract :
As the prime working character of beam pumping unit dynamometer card and electrical characteristics can be captured by the high speed synchronous data acquisition with the PC as the core. The motion of beam pumping unit can be divided into four quadrant´s according to the crank movement patterns, making use of the synchronization test data the loss can be calculated in four quadrants, and a concise judgment method to oil well short of liquid. An field application example shows the effectiveness of this technology.
Keywords :
DC generators; computerised instrumentation; data acquisition; data analysis; dynamometers; microcomputers; motion measurement; oil technology; production engineering computing; pumps; PC; beam pumping unit dynamometer card; beam pumping unit synchronization test data analysis; crank movement pattern; electrical characteristics; four quadrant calculation; high speed synchronous data acquisition; synchronization test data loss; Data acquisition; Laser excitation; Petroleum; Production; Pumps; Synchronization; Synchronous motors; data analysis; pumping unit; synchronization; test;
Conference_Titel :
Measuring Technology and Mechatronics Automation (ICMTMA), 2013 Fifth International Conference on
Conference_Location :
Hong Kong
Print_ISBN :
978-1-4673-5652-7
DOI :
10.1109/ICMTMA.2013.279