• DocumentCode
    1894736
  • Title

    A tight flow control for job-shop fabrication lines with finite buffers

  • Author

    Toba, Hiroyasu

  • Author_Institution
    C&C Res. Labs., NEC Corp., Kanagawa, Japan
  • fYear
    1997
  • fDate
    6-8 Oct 1997
  • Abstract
    We propose WIP estimation how control method which serves as a countermeasure against the evaluating timelag problem and the throughput degradation problem with the conventional flow control method (push-pull method). The most important features of this method are: (1) how control based on WIP estimation and scheduling, (2) the breaking down of the entire schedule into individual lot schedules, and (3) greedy lot scheduling for contiguous finite buffers. In actual LCD fabrication line simulation we have confirmed that WIP estimation method is a promising one from the standpoint of line throughput obtained with
  • Keywords
    digital simulation; electronic equipment manufacture; liquid crystal displays; process control; scheduling; LCD TFT panel; LCD fabrication; WIP estimation; contiguous finite buffers; finite buffers; flow control; job-shop fabrication lines; line throughput; scheduling; simulation; throughput degradation; Automatic control; Color; Contamination; Degradation; Fabrication; Laboratories; National electric code; Production equipment; Scheduling; Throughput;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Semiconductor Manufacturing Conference Proceedings, 1997 IEEE International Symposium on
  • Conference_Location
    San Francisco, CA
  • Print_ISBN
    0-7803-3752-2
  • Type

    conf

  • DOI
    10.1109/ISSM.1997.664532
  • Filename
    664532