DocumentCode :
1895357
Title :
Transmission impacts and visualization of new generation
Author :
Smith, Darnell R. ; Overbye, Thomas J.
Author_Institution :
Illinois Univ., Urbana, IL, USA
fYear :
2001
fDate :
2001
Firstpage :
393
Lastpage :
398
Abstract :
With deregulation in the electric industry the process of siting new generation has changed dramatically. In the previous vertically integrated utility paradigm, the local utility could bundle the cost of new transmission with the costs associated with adding generation. With deregulation, independent generators usually wish to site at locations in which their new generation will not cause any new overloads in the transmission grid. This paper describes a process for systematically determining the impact new generation will have on the transmission system. Emphasis is also placed on the visualization of these transmission system impacts
Keywords :
electric power generation; electricity supply industry; environmental factors; electric industry deregulation; independent generators; new power generation visualization; transmission grid; transmission impacts; Costs; Economies of scale; Mesh generation; Monopoly; Power engineering and energy; Power generation; Power industry; Power systems; Reliability engineering; Visualization;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Electrical Insulation Conference and Electrical Manufacturing & Coil Winding Conference, 2001. Proceedings
Conference_Location :
Cincinnati, OH
ISSN :
0362-2479
Print_ISBN :
0-7803-7180-1
Type :
conf
DOI :
10.1109/EEIC.2001.965698
Filename :
965698
Link To Document :
بازگشت