• DocumentCode
    1897988
  • Title

    A Hierarchical Planning and Scheduling Framework for TFT-LCD Production Chain

  • Author

    Lin, James T. ; Chen, Tzu-Li ; Lin, Yen-Ting

  • Author_Institution
    Dept. of Ind. Eng., Nat. Tsing Hua Univ., Hsinchu
  • fYear
    2006
  • fDate
    21-23 June 2006
  • Firstpage
    711
  • Lastpage
    716
  • Abstract
    This paper presents a hierarchical planning and scheduling framework for Thin Film Transistor Liquid Crystal Display (TFT-LCD) production chain in an assembly-to-order (ATO) environment. The TFT-LCD manufacturing process comprises three sequential steps, namely TFT-LCD production chain: Array, Cell and Module process. Many special characteristics and constraints, such as product grade constraint, site-eligibility constraint and key material available constraint, are inherited in this production chain. The globally distributed nature of production planning and scheduling activities of TFT-LCD production also leads to an urgent need of an integrated planning and scheduling framework to balance supply and demand problems. The hierarchical framework divides planning hierarchies into three planning levels, identifying planning modules in each level in attempt to balance the supply and demand of the TFT-LCD production chain. Finally, an example is illustrated to demonstrate the relationship among the planning modules in the framework
  • Keywords
    assembling; liquid crystal displays; production planning; scheduling; supply and demand; thin film transistors; TFT-LCD production chain; array process; assembly-to-order environment; cell process; hierarchical planning; key material available constraint; manufacturing process; module process; product grade constraint; production planning; scheduling framework; site-eligibility constraint; supply and demand; thin film transistor liquid crystal display; Assembly; Crystalline materials; Job shop scheduling; Liquid crystal displays; Manufacturing processes; Monitoring; Product design; Production planning; Supply and demand; Thin film transistors; Production Chain; Production Plan; Scheduling; TFT;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Service Operations and Logistics, and Informatics, 2006. SOLI '06. IEEE International Conference on
  • Conference_Location
    Shanghai
  • Print_ISBN
    1-4244-0317-0
  • Electronic_ISBN
    1-4244-0318-9
  • Type

    conf

  • DOI
    10.1109/SOLI.2006.329077
  • Filename
    4125669