Foresight versus simulation: Construction planning using graphical constraint-based modeling
Author
Flood, Ian
Author_Institution
Coll. of Design, Constr. & Planning, Univ. of Florida, Gainesville, FL, USA
fYear
2010
fDate
5-8 Dec. 2010
Firstpage
3015
Lastpage
3024
Abstract
Planning construction projects typically makes use of the activity network-based Critical Path Method (CPM) since it is simple to use and reasonably versatile. Most other planning techniques are either aimed at specialized types of construction work (such as linear scheduling) or are peripheral tools to be used conjunctively (such as nD-CAD). Discrete-event simulation has also been used for construction planning, and while it is extremely versatile, it lacks the simplicity in use of CPM and so has not been widely adopted within the industry. This paper goes back to first principles, identifying the needs of construction project planning and how existing tools meet (or fail to meet) these requirements. Based on this, it proposes a new modeling paradigm, Foresight, better suited to contemporary construction project planning. The principles of the method and its relative merits are demonstrated relative to conventional simulation in a series of construction case studies.
Keywords
CAD; civil engineering computing; construction industry; critical path analysis; discrete event simulation; project management; Foresight; construction project planning; critical path method; discrete-event simulation; graphical constraint-based modeling; Adaptation model; Cyclones; Floods; Load modeling; Schedules; Scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Simulation Conference (WSC), Proceedings of the 2010 Winter
Conference_Location
Baltimore, MD
ISSN
0891-7736
Print_ISBN
978-1-4244-9866-6
Type
conf
DOI
10.1109/WSC.2010.5678995
Filename
5678995
Link To Document