• DocumentCode
    1911325
  • Title

    Construction process simulation in bridge building based on significant day-to-day data

  • Author

    Ailland, Karin ; Bargstädt, Hans-Joachim ; Hollermann, Sebastian

  • Author_Institution
    Bauhaus-Univ., Weimar, Germany
  • fYear
    2010
  • fDate
    5-8 Dec. 2010
  • Firstpage
    3250
  • Lastpage
    3261
  • Abstract
    Everyday life on bridge construction sites is commonly characterized by enormous pressure due to time and costs as well as difficult logistic requirements. Modern process simulation tools can be applied with increasing success. Projects are often affected by unscheduled constraints and limitations, that give reason to deviate from the formerly optimized plan, and to find ad-hoc solutions, especially in the erection phase. In order to meet these requirements, simulation tools in the erection phase with a more specific database are needed. An approach based on accurate day-to-day data for the current project state at any time is needed. These data then facilitate the simulation of possible variations for ongoing optimization. At first, it is necessary to determine, which choice of data is significant and actually needed for evaluating the day-to-day status in bridge construction progress. Secondly, the required data must be captured as efficiently as possible during the ongoing working activities.
  • Keywords
    bridges (structures); digital simulation; structural engineering computing; bridge building; construction process simulation; simulation tools; Bridges; Buildings; Data models; Monitoring; Optimization;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Simulation Conference (WSC), Proceedings of the 2010 Winter
  • Conference_Location
    Baltimore, MD
  • ISSN
    0891-7736
  • Print_ISBN
    978-1-4244-9866-6
  • Type

    conf

  • DOI
    10.1109/WSC.2010.5679017
  • Filename
    5679017