DocumentCode
1911325
Title
Construction process simulation in bridge building based on significant day-to-day data
Author
Ailland, Karin ; Bargstädt, Hans-Joachim ; Hollermann, Sebastian
Author_Institution
Bauhaus-Univ., Weimar, Germany
fYear
2010
fDate
5-8 Dec. 2010
Firstpage
3250
Lastpage
3261
Abstract
Everyday life on bridge construction sites is commonly characterized by enormous pressure due to time and costs as well as difficult logistic requirements. Modern process simulation tools can be applied with increasing success. Projects are often affected by unscheduled constraints and limitations, that give reason to deviate from the formerly optimized plan, and to find ad-hoc solutions, especially in the erection phase. In order to meet these requirements, simulation tools in the erection phase with a more specific database are needed. An approach based on accurate day-to-day data for the current project state at any time is needed. These data then facilitate the simulation of possible variations for ongoing optimization. At first, it is necessary to determine, which choice of data is significant and actually needed for evaluating the day-to-day status in bridge construction progress. Secondly, the required data must be captured as efficiently as possible during the ongoing working activities.
Keywords
bridges (structures); digital simulation; structural engineering computing; bridge building; construction process simulation; simulation tools; Bridges; Buildings; Data models; Monitoring; Optimization;
fLanguage
English
Publisher
ieee
Conference_Titel
Simulation Conference (WSC), Proceedings of the 2010 Winter
Conference_Location
Baltimore, MD
ISSN
0891-7736
Print_ISBN
978-1-4244-9866-6
Type
conf
DOI
10.1109/WSC.2010.5679017
Filename
5679017
Link To Document