Title :
How to Justify a Power Station C&I Refurbishment
Author :
Mogridge, Lynton
Author_Institution :
Somerford Consulting, Birmingham
Abstract :
Although C&I systems are now seen to have a life expectancy of only 10 to 12 years, C&I refurbishments remain as difficult as ever to justify. This presentation will review the primary drivers for C&I refurbishments, what benefits, improvements and avoidance of degraded performance can be achieved and how these factors can be used to justify refurbishment.
Keywords :
power stations; power system management; C&I systems; power station C&I refurbishment;
Conference_Titel :
Power Generation Control, 2006. The Institution of Engineering and Technology Seminar on
Conference_Location :
Birmingham
Print_ISBN :
0-86341-728-0