DocumentCode :
1918651
Title :
A Case Study On Successful IS Project Management; The Quadruple Constraint as the Root for Project Success
Author :
Tulnón, E. ; Jaén, J.A. ; Coronado, S.
Author_Institution :
Madrid Polytech. Univ.
Volume :
2
fYear :
2005
fDate :
21-24 Nov. 2005
Firstpage :
1056
Lastpage :
1059
Abstract :
This paper illustrates the case of an information system (IS) project that was heading for costs and time overruns; yet it was successful. The paper describes the project, its main risks and the approach undertaken by the IS project manager to mitigate them. This article explains how the project manager turned a difficult project around and brought it under control by using basic project management techniques. The paper summarizes those techniques in five recommendations that may be valid for other projects as well
Keywords :
information systems; personnel; project management; risk analysis; software development management; IS project management; information system; risk management; work breakdown structure; Business; Computer aided software engineering; Costs; Electric breakdown; Electronic commerce; Information analysis; Information technology; Management information systems; Project management; Risk management; Information Systems; Information Technology; Project Management; Quadruple Constrain; Risk Management and Work Breakdown Structure;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computer as a Tool, 2005. EUROCON 2005.The International Conference on
Conference_Location :
Belgrade
Print_ISBN :
1-4244-0049-X
Type :
conf
DOI :
10.1109/EURCON.2005.1630131
Filename :
1630131
Link To Document :
بازگشت