Critical Chain Project risk control with Management strengths
Author
Li Cun-Bin ; Lu Bing-De ; Xiao-yi, Zhang
Author_Institution
Sch. of Econ. & Manage., North China Electr. Power Univ., Beijing, China
fYear
2010
fDate
8-10 Aug. 2010
Firstpage
383
Lastpage
386
Abstract
The application of critical chain breaks through the bottleneck of project management, and enhances the project risk management. However, the calculation of the buffer is a hot issue in Critical Chain Project Management (CCPM), and the current calculation methods lack management theory. In this paper,the management strength fuzzy variable is introduced creatively, and it provides a bridge between management theory and mathematics, analyses the success factors of the CCPM. The model which combines management and mathematics is set up. The model is a new method which can confirm the project buffer, and the case study proved that it has a strong theoretical reliability.
Keywords
fuzzy set theory; project management; risk management; supply chain management; CCPM; critical chain project risk control; management strength fuzzy variable; management theory; project buffer; project risk management; Industrial economics; CCPM; fuzzy variable; management strengths; project buffer; risk control;
fLanguage
English
Publisher
ieee
Conference_Titel
Emergency Management and Management Sciences (ICEMMS), 2010 IEEE International Conference on
Conference_Location
Beijing
Print_ISBN
978-1-4244-6064-9
Type
conf
DOI
10.1109/ICEMMS.2010.5563420
Filename
5563420
Link To Document