Project scheduling in AND-OR Graphs based on Design Structure Matrix
Author
Ren, Lidi ; Bai, Sijun ; Guo, Yuntao
Author_Institution
Sch. of Manage., Northwestern Polytech. Univ., Xi´´an, China
fYear
2010
fDate
8-10 Aug. 2010
Firstpage
161
Lastpage
164
Abstract
This paper considers a project scheduling problem in AND-OR Graphs which include two types of nodes to represent the relationship of predecessor and successor. The problem is to find the earliest starting times for all activities and calculate the project duration. Using the Design Structure Matrix to capture the information flow between two tasks, a model was given to solve the problem in this paper.
Keywords
graph theory; project management; scheduling; AND-OR graphs; design structure matrix; project scheduling; Analytical models; Book reviews; Educational institutions; Real time systems; Robots; AND-OR Graphs; design structure matrix; project scheduling problem;
fLanguage
English
Publisher
ieee
Conference_Titel
Emergency Management and Management Sciences (ICEMMS), 2010 IEEE International Conference on
Conference_Location
Beijing
Print_ISBN
978-1-4244-6064-9
Type
conf
DOI
10.1109/ICEMMS.2010.5563476
Filename
5563476
Link To Document