    Project scheduling in AND-OR Graphs based on Design Structure Matrix

  • Author

    Ren, Lidi ; Bai, Sijun ; Guo, Yuntao

  • Author_Institution
    Sch. of Manage., Northwestern Polytech. Univ., Xi´´an, China
  • fYear
    2010
  • fDate
    8-10 Aug. 2010
  • Firstpage
    161
  • Lastpage
    164
  • Abstract
    This paper considers a project scheduling problem in AND-OR Graphs which include two types of nodes to represent the relationship of predecessor and successor. The problem is to find the earliest starting times for all activities and calculate the project duration. Using the Design Structure Matrix to capture the information flow between two tasks, a model was given to solve the problem in this paper.
  • Keywords
    graph theory; project management; scheduling; AND-OR graphs; design structure matrix; project scheduling; Analytical models; Book reviews; Educational institutions; Real time systems; Robots; AND-OR Graphs; design structure matrix; project scheduling problem;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Emergency Management and Management Sciences (ICEMMS), 2010 IEEE International Conference on
  • Conference_Location
    Beijing
  • Print_ISBN
    978-1-4244-6064-9
  • Type

    conf

  • DOI
    10.1109/ICEMMS.2010.5563476
  • Filename
    5563476