DocumentCode :
1930745
Title :
Nuclear power plant digital instrumentation and control modifications
Author :
Gan, Boris ; Brendlen, Joseph H., Jr.
fYear :
1992
fDate :
25-31 Oct 1992
Firstpage :
730
Abstract :
An instrumentation and control systems upgrade is planned for Three Mile Island Unit 1, an 871 MW Babcock and Wilcox pressurized water reactor. Installation will be completed in phases extending over four or more operating cycles. It will encompass most nonnuclear instrumentation and control functions, including makeup/letdown, condensate demineralizer, feedwater demand, and reactor demand. The system platform chosen is a state-of-the-art, fault-tolerant architecture which has been extensively evaluated by the B&W Owners Group. The platform will also provide operator interface for other vendor supplied digital control systems such as turbine control
Keywords :
digital instrumentation; fault tolerant computing; nuclear engineering computing; nuclear power stations; power station computer control; 871 MW; TMI-1; condensate demineralizer; digital instrumentation and control; fault-tolerant architecture; feedwater demand; makeup/letdown; reactor demand; Control systems; Digital control; Distributed control; Force control; Inductors; Instruments; Power generation; Reactor instrumentation; Relays; Turbines;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Nuclear Science Symposium and Medical Imaging Conference, 1992., Conference Record of the 1992 IEEE
Conference_Location :
Orlando, FL
Print_ISBN :
0-7803-0884-0
Type :
conf
DOI :
10.1109/NSSMIC.1992.301380
Filename :
301380
Link To Document :
بازگشت