DocumentCode
1935206
Title
A Fuzzy Scheduling Method in Equipment Grid
Author
Yin, Jie ; Wang, Yue-xuan ; Wu, Cheng
Author_Institution
Tsinghua Univ., Beijing
Volume
6
fYear
2007
fDate
19-22 Aug. 2007
Firstpage
3099
Lastpage
3103
Abstract
Equipment grid and equipment pool model of equipment grid are introduced. The process from submitting a job in equipment grid to obtaining of results is analyzed. A fuzzy scheduling method is proposed in equipment pool when a job is submitted to one of equipments within a pool. Fuzziness of this method lies in vagueness of users´ appraisals about experiment results and execution quality of equipments. Equipment in a pool has a probability, which can be adjusted by users´ fuzzy appraisals, to be scheduled. Users´ feedback information is used in this paper to improve execution quality. Some algorithms are provided to increase utilization ratio of equipments with high execution quality and decrease utilization ratio of those with poor execution quality. From simulation result, it is obvious that this method and related algorithms can provide users more chances with high execution quality.
Keywords
feedback; fuzzy set theory; scheduling; equipment grid; equipment pool model; execution quality; feedback information; fuzzy appraisals; fuzzy scheduling method; Appraisal; Computer integrated manufacturing; Cybernetics; Feedback; Instruments; Joining processes; Machine learning; Prediction methods; Processor scheduling; Resource management; Equipment grid; Execution quality; Fuzzy; Scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Machine Learning and Cybernetics, 2007 International Conference on
Conference_Location
Hong Kong
Print_ISBN
978-1-4244-0973-0
Electronic_ISBN
978-1-4244-0973-0
Type
conf
DOI
10.1109/ICMLC.2007.4370680
Filename
4370680
Link To Document