• DocumentCode
    1935206
  • Title

    A Fuzzy Scheduling Method in Equipment Grid

  • Author

    Yin, Jie ; Wang, Yue-xuan ; Wu, Cheng

  • Author_Institution
    Tsinghua Univ., Beijing
  • Volume
    6
  • fYear
    2007
  • fDate
    19-22 Aug. 2007
  • Firstpage
    3099
  • Lastpage
    3103
  • Abstract
    Equipment grid and equipment pool model of equipment grid are introduced. The process from submitting a job in equipment grid to obtaining of results is analyzed. A fuzzy scheduling method is proposed in equipment pool when a job is submitted to one of equipments within a pool. Fuzziness of this method lies in vagueness of users´ appraisals about experiment results and execution quality of equipments. Equipment in a pool has a probability, which can be adjusted by users´ fuzzy appraisals, to be scheduled. Users´ feedback information is used in this paper to improve execution quality. Some algorithms are provided to increase utilization ratio of equipments with high execution quality and decrease utilization ratio of those with poor execution quality. From simulation result, it is obvious that this method and related algorithms can provide users more chances with high execution quality.
  • Keywords
    feedback; fuzzy set theory; scheduling; equipment grid; equipment pool model; execution quality; feedback information; fuzzy appraisals; fuzzy scheduling method; Appraisal; Computer integrated manufacturing; Cybernetics; Feedback; Instruments; Joining processes; Machine learning; Prediction methods; Processor scheduling; Resource management; Equipment grid; Execution quality; Fuzzy; Scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Machine Learning and Cybernetics, 2007 International Conference on
  • Conference_Location
    Hong Kong
  • Print_ISBN
    978-1-4244-0973-0
  • Electronic_ISBN
    978-1-4244-0973-0
  • Type

    conf

  • DOI
    10.1109/ICMLC.2007.4370680
  • Filename
    4370680