• DocumentCode
    1935445
  • Title

    A GA-Based Approach for Solving Fuzzy Project Scheduling

  • Author

    Liu, Yan ; Zhao, Sheng-Li ; Zhang, Xi-ping ; Du, Guang-Qian

  • Author_Institution
    China Univ. of Min. & Technol., Beijing
  • Volume
    6
  • fYear
    2007
  • fDate
    19-22 Aug. 2007
  • Firstpage
    3153
  • Lastpage
    3156
  • Abstract
    In this paper, a new optimization method based on GA for solving resource-constraint project scheduling with uncertain activity duration is proposed. Fuzzy set theory is used to represent the uncertainties of activity duration. A searching technique using genetic algorithm is adopted to search for the minimum of fuzzy project makespan. A case with uncertain activity duration is used to illustrate the performance of the proposed method.
  • Keywords
    fuzzy set theory; genetic algorithms; scheduling; search problems; GA-based approach; fuzzy project scheduling; fuzzy set theory; optimization method; searching technique; uncertain activity duration; Civil engineering; Cybernetics; Educational institutions; Fuzzy set theory; Fuzzy sets; Genetic algorithms; Machine learning; Project management; Resource management; Uncertainty; Fuzzy set theory; Genetic algorithm; Project scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Machine Learning and Cybernetics, 2007 International Conference on
  • Conference_Location
    Hong Kong
  • Print_ISBN
    978-1-4244-0973-0
  • Electronic_ISBN
    978-1-4244-0973-0
  • Type

    conf

  • DOI
    10.1109/ICMLC.2007.4370690
  • Filename
    4370690