DocumentCode
1937532
Title
Spacecraft complexity subfactors and implications on future cost growth
Author
Leising, C.J. ; Wessen, R. ; Ellyin, R. ; Rosenberg, Luke ; Leising, A.
Author_Institution
Jet Propulsion Lab., California Inst. of Technol., Pasadena, CA, USA
fYear
2013
fDate
2-9 March 2013
Firstpage
1
Lastpage
11
Abstract
During the last ten years the Jet Propulsion Laboratory has used a set of cost-risk subfactors to independently estimate the magnitude of development risks that may not be covered in the high level cost models employed during early concept development. Within the last several years the Laboratory has also developed a scale of Concept Maturity Levels with associated criteria to quantitatively assess a concept´s maturity. This latter effort has been helpful in determining whether a concept is mature enough for accurate costing but it does not provide any quantitative estimate of cost risk. Unfortunately today´s missions are significantly more complex than when the original cost-risk subfactors were first formulated. Risks associated with complex missions are not being adequately evaluated and future cost growth is being underestimated. The risk subfactor process needed to be updated.
Keywords
aerospace propulsion; costing; estimation theory; space vehicles; Jet Propulsion Laboratory; accurate costing; complex missions; concept maturity levels; cost growth; cost risk; cost-risk subfactors; quantitative estimate; risk subfactor process; spacecraft complexity subfactors; Attitude control; Complexity theory; Instruments; Laboratories; Propulsion; Space vehicles;
fLanguage
English
Publisher
ieee
Conference_Titel
Aerospace Conference, 2013 IEEE
Conference_Location
Big Sky, MT
ISSN
1095-323X
Print_ISBN
978-1-4673-1812-9
Type
conf
DOI
10.1109/AERO.2013.6497159
Filename
6497159
Link To Document