• DocumentCode
    1943407
  • Title

    Scheduling technology with complexity cooperation constrains

  • Author

    Li, Jingsheng ; Wang, Aimin ; Tang, Chengtong

  • Author_Institution
    Beijing Inst. of Technol., Beijing, China
  • fYear
    2010
  • fDate
    13-15 Aug. 2010
  • Firstpage
    606
  • Lastpage
    610
  • Abstract
    A new kind of scheduling method for the complexity cooperation constrains is build to solve the cooperation problem of hierarchical kit and assembling pull in job shop and assembling production. Aiming to solve this problem, the methods are proposed to support the scheduling progress. The virtual kit process is adopted for assembling scheduling. The job shop and assemblage process unified data model is build, which is based on complex producing constraint by synthetically considering the process relation, production resources, scheduling time, hierarchical kit and other scheduling rules. The hybrid scheduling arithmetic based on heuristics rules is proposed, which is grouped by the positive pull and push-down scheduling arithmetic. In the end the effectiveness of the system is tested and verified by a real instance.
  • Keywords
    assembling; job shop scheduling; just-in-time; assembling production; complexity cooperation constrains; heuristics rules; hierarchical kit; job shop production; positive pull scheduling arithmetic; process relation; production resources; push-down scheduling arithmetic; scheduling technology; scheduling time; virtual kit process; Clamps; Complexity theory; Job shop scheduling; Milling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Control and Information Processing (ICICIP), 2010 International Conference on
  • Conference_Location
    Dalian
  • Print_ISBN
    978-1-4244-7047-1
  • Type

    conf

  • DOI
    10.1109/ICICIP.2010.5564237
  • Filename
    5564237