DocumentCode :
1943407
Title :
Scheduling technology with complexity cooperation constrains
Author :
Li, Jingsheng ; Wang, Aimin ; Tang, Chengtong
Author_Institution :
Beijing Inst. of Technol., Beijing, China
fYear :
2010
fDate :
13-15 Aug. 2010
Firstpage :
606
Lastpage :
610
Abstract :
A new kind of scheduling method for the complexity cooperation constrains is build to solve the cooperation problem of hierarchical kit and assembling pull in job shop and assembling production. Aiming to solve this problem, the methods are proposed to support the scheduling progress. The virtual kit process is adopted for assembling scheduling. The job shop and assemblage process unified data model is build, which is based on complex producing constraint by synthetically considering the process relation, production resources, scheduling time, hierarchical kit and other scheduling rules. The hybrid scheduling arithmetic based on heuristics rules is proposed, which is grouped by the positive pull and push-down scheduling arithmetic. In the end the effectiveness of the system is tested and verified by a real instance.
Keywords :
assembling; job shop scheduling; just-in-time; assembling production; complexity cooperation constrains; heuristics rules; hierarchical kit; job shop production; positive pull scheduling arithmetic; process relation; production resources; push-down scheduling arithmetic; scheduling technology; scheduling time; virtual kit process; Clamps; Complexity theory; Job shop scheduling; Milling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent Control and Information Processing (ICICIP), 2010 International Conference on
Conference_Location :
Dalian
Print_ISBN :
978-1-4244-7047-1
Type :
conf
DOI :
10.1109/ICICIP.2010.5564237
Filename :
5564237
Link To Document :
بازگشت