• DocumentCode
    1950321
  • Title

    IEC 61850 based Control System for Power Distribution at ITER

  • Author

    Nair, Supriya A. ; Hourtoule, J. ; Gascon, J. ; Gulati, H.K. ; Calle, R. De La ; Lescure, C. ; Singh, M.

  • Author_Institution
    ITER Organ., St. Paul-lez-Durance, France
  • fYear
    2011
  • fDate
    26-30 June 2011
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    This paper outlines the process and procedures adopted to design the architecture and functional requirements of the Instrumentation and Control (I&C) based on IEC 61850 standards. The I&C system of the Electrical Power Distribution network will conform to the standards, specifications and interfaces as set down by the ITER Organization and applied by the suppliers in the Domestic Agencies(DAs). The IEC 61850 system will ensure the reliable, smooth operation and maintenance of ITER electrical Control System at Cadarache.
  • Keywords
    IEC standards; Tokamak devices; electric control equipment; fusion reactor design; fusion reactor operation; physical instrumentation control; plasma toroidal confinement; power distribution control; I and C system; IEC 61850 based control system; IEC 61850 standards; ITER electrical control system; ITER power distribution; control architecture; control functional requirements; electrical power distribution network; instrumentation architecture; instrumentation functional requirements; IEC standards; Monitoring; Reliability; Switches; Waste heat; XML; I&C; IEC 61850; ITER; PPEN; SSEN;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Fusion Engineering (SOFE), 2011 IEEE/NPSS 24th Symposium on
  • Conference_Location
    Chicago, IL
  • ISSN
    1078-8891
  • Print_ISBN
    978-1-4577-0669-1
  • Electronic_ISBN
    1078-8891
  • Type

    conf

  • DOI
    10.1109/SOFE.2011.6052342
  • Filename
    6052342