DocumentCode :
1954664
Title :
Optimization of Scheduling for Construction Corporation
Author :
Aksyonov, Konstantin ; Bykov, Eugene ; Aksyonova, Olga
Author_Institution :
Dept. of Inf. Technol., Ural Fed. Univ., Ekaterinburg, Russia
fYear :
2013
fDate :
29-31 Jan. 2013
Firstpage :
310
Lastpage :
314
Abstract :
The paper dives into a set of tasks that emerge when planning activities of a corporation, involved into construction of multiple objects. This task is referred to as the problem of project portfolio. Problem of planning construction works and its software implementation are solved with aid of integration of multi-agent modeling and critical path method. The achieved benefit in time and cost relies on use of the simulation system and decision support system of BPsim products family, which has been developed by the authors. At the end of paper the economic effect of deployment and its calculations are briefly noted.
Keywords :
construction industry; critical path analysis; decision support systems; investment; multi-agent systems; project management; strategic planning; BPsim products; construction corporation scheduling optimization; construction work planning problem; corporation planning activities; critical path method; decision support system; economic effect; multiagent modeling; project portfolio problem; simulation system; software implementation; Analytical models; Buildings; Graphics; Load modeling; Multi-agent systems; Planning; Portfolios; agents; decision support systems; modeling; simulation; convolution; critical path method;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent Systems Modelling & Simulation (ISMS), 2013 4th International Conference on
Conference_Location :
Bangkok
ISSN :
2166-0662
Print_ISBN :
978-1-4673-5653-4
Type :
conf
DOI :
10.1109/ISMS.2013.112
Filename :
6498286
Link To Document :
بازگشت