• DocumentCode
    1958976
  • Title

    Consequences of kicker failure during HEB to collider injection and possible mitigation

  • Author

    Soundranayagam, R. ; Drozhdin, A.I. ; Mokhov, N.V. ; Parker, B. ; Schailey, R. ; Wang, R.

  • Author_Institution
    Superconducting Super Collider Lab., Dallas, TX, USA
  • fYear
    1993
  • fDate
    17-20 May 1993
  • Firstpage
    1360
  • Abstract
    We discuss the three failure modes, namely, single kicker failure, two kickers failure and timing error between the extraction and injection kickers. We propose possible means of protecting the accelerator components
  • Keywords
    beam handling equipment; proton accelerators; synchrotrons; HEB; SSC; collider injection; extraction kickers; injection kickers; single kicker failure; timing error; two kickers failure; Apertures; Clocks; Colliding beam devices; Contracts; Counting circuits; Educational institutions; Iron; Magnets; Protection; Timing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 1993., Proceedings of the 1993
  • Conference_Location
    Washington, DC
  • Print_ISBN
    0-7803-1203-1
  • Type

    conf

  • DOI
    10.1109/PAC.1993.308597
  • Filename
    308597