DocumentCode :
1959127
Title :
Preliminary testing of the LEB to MEB transfer kicker modulator prototype
Author :
Pappas, G.C. ; Askew, D.R.
Author_Institution :
Superconducting Super Collider Lab., Dallas, TX, USA
fYear :
1993
fDate :
17-20 May 1993
Firstpage :
1336
Abstract :
The extraction kicker for the Low Energy Booster (LEB) is used to deflect a 12 GeV/c proton beam from the synchrotron into a transfer line. A kicker system of similar design is used to inject the beam from the transfer line into the Medium Energy Booster (MEB). The modulator requirements for these kicker systems are to deliver a pulse train of seven 1.6 kA, 2.5 μs pulses at a pulse-repetition frequency of 10 pps, every seven seconds for one hour. The impedance of the modulator is 12.5 Ω resulting in a charge voltage of 40 kV. The 10-90% rise time of the pulses is 20 ns, and the 1-99% fall time is 2 μs. The allowable pulse ripple is ±1% of the peak current during the pulse, and ±0.3% from pulse to pulse. The shot to-shot timing jitter requirement is less than 2ns. This paper describes the design and performance of the prototype modulator which was fabricated to meet these specifications
Keywords :
beam handling equipment; modulators; nuclear electronics; proton accelerators; pulsed power technology; superconducting magnets; synchrotrons; 1.6 kA; 12 GeV; 2.5 mus; 40 kV; LEB to MEB transfer kicker modulator prototype; Low Energy Booster; Medium Energy Booster; extraction kicker; pulse-repetition frequency; shot to-shot timing jitter; Circuit faults; Circuit testing; Frequency; Prototypes; Pulse modulation; Pulse power systems; Pulse transformers; Superconducting magnets; Thyristors; Voltage;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 1993., Proceedings of the 1993
Conference_Location :
Washington, DC
Print_ISBN :
0-7803-1203-1
Type :
conf
DOI :
10.1109/PAC.1993.308603
Filename :
308603
Link To Document :
بازگشت