DocumentCode
1960919
Title
A GPU Algorithm Design for Resource Constrained Project Scheduling Problem
Author
Bukata, L. ; Sucha, Premysl
Author_Institution
Dept. of Control Eng., Czech Tech. Univ. in Prague, Prague, Czech Republic
fYear
2013
fDate
Feb. 27 2013-March 1 2013
Firstpage
367
Lastpage
374
Abstract
This work proposes a GPU algorithm for a combinatorial problem known in literature as Resource Constrained Project Scheduling Problem. To solve this NP-hard problem, Tabu Search meta-heuristic is selected. All computations are performed on the GPU to minimize required communication bandwidth between the GPU and the CPU. In addition, new evaluation algorithm and effective Tabu List implementation are designed especially for GPUs. Achieved results show that the proposed GPU solution outperforms the equivalent CPU version in both quality of solutions and performance speedup.
Keywords
graphics processing units; processor scheduling; search problems; CPU version; GPU algorithm design; NP-hard problem; combinatorial problem; communication bandwidth; resource constrained project scheduling problem; tabu search meta-heuristic; Arrays; Central Processing Unit; Computational modeling; Equations; Graphics processing units; Mathematical model; Schedules; GPU; RCPSP; Tabu Search; homogenous model;
fLanguage
English
Publisher
ieee
Conference_Titel
Parallel, Distributed and Network-Based Processing (PDP), 2013 21st Euromicro International Conference on
Conference_Location
Belfast
ISSN
1066-6192
Print_ISBN
978-1-4673-5321-2
Electronic_ISBN
1066-6192
Type
conf
DOI
10.1109/PDP.2013.59
Filename
6498577
Link To Document